CO-LWF

Leg wrapper tow bar female

$0.00
shipping

Fast Shipping quote upon checkout

In Stock

In stock

Various payment methods available

Various payment methods available

ready for dispatch in 1-2 days

Ready for dispatch upon order confirmation

Enquire Now

Leg wrapper tow bar female

$0.00

  • Reduce forklift injuries
  • Helps increase productivity
  • Hardware included
SKU: CO-LWF Categories: ,

Description

The CO-LWF is a tow-bar, when combine with CO-LWM becomes a tow system and a major asset for any business wishing to switch from the typical forklift method to a leaner towing train method within its facilities.

Ideal for material handling in a variety of industries, hop on the train and integrate these components into tugs, carts, pallet trucks and any other type of transport structure.

Not only can a single operator deliver material to a single production area without the use of a pallet truck or forklift, but it also helps reduce forklift accidents.

Be part of the lean trend and rebuild your assembly lines with a tow train system.

Towing capacity:
The towing capacity is 1570 lbs.

Antistatic (ESD) :
Compatible with EP-96-ST and EP-96-BK.

Installation Steps:
See the installation step tab for how to assemble the CO-LWF.

Do you want to reuse parts of your old system?
The CO-LWF is compatible with many other tube and connector systems. Consult the technical information tab to find out which systems are compatible with our parts.

Additional information

Type

Usage

ESD

More Information
Box Quantity 1
Weight 8.502 lb (3.865 kg)
Loading Capacity 1570 lb maximum towing capacity
  1. Ensure you have the following parts:
    • 1x CO-LWF
    • 4x U Bolts
    • 8x Nuts
    • 4x Spacer plates
    • 2x 28mm pipes of your choice
    • 1x 13 mm Flat wrench
    • 1x 13 mm Socket wrench
  2. Place CO-LWF under P-1 and P-2 and line up corresponding holes.
  3. Install  (1) U-bolt through corresponding holes, insert spacer plate and lightly tighten using two nuts from the under side of the CO-LWF.
  4. Repeat step 3 with remaining (3) U-bolts.
  5. Once all U-bolts have been installed, proceed to fully tighten using the
    Flat and socket wrench.