Case Studies
Real results from the global Flexpipe network — floor space recovered, picking tripled, injuries eliminated, workstation costs cut. Explore how manufacturers, warehouses and councils use the modular pipe & joint system, then talk to us about your project.
3× Picking Efficiency Across 13 Warehouses
A 3PL standardised modular pick infrastructure across 13 sites and tripled picking efficiency.
25% Floor Space Recovered, 50% Faster
Custom gravity racks re-fed a packaging plant’s new digital presses.
Faster Order Fulfilment Without Automation
A one-week warehouse Kaizen with modular flow racks built the same week.
Same-Day JIT Shipping, Zero Transit Damage
Custom protective carts for scratch-sensitive parts kept a JIT line on time.
+25% Production at a Medical Manufacturer
Modular workstations and flow racks lifted production efficiency by 25%.
Ergonomic Workstations at 65% Less Cost
Operator-designed modular benches cut cost 65% and removed strain.
40%+ Saved on Aerospace Workstations
An in-house modular build workshop saved 40%+ on workstations.
−50% Assembly Floor Space & Lead Time
Set-based FIFO flow racks halved floor space and lead time.
Custom Carts Boosted Plant Productivity
Narrow custom carts cut cart moves from two workers to one.
Council Road Crews Cut Injuries
Purpose-built signage carts cut injuries and won a safety award.
Have a project like these?
Send us your challenge — we’ll design a solution around your dimensions, loads and site.









